Energie Steiermarks central District heating plant in Graz, supplies the major part of the City’s District Heating with a peak load of 550 MW and an annual demand of app. 1200 GWh. At the time of construction, winter time supply was mainly from CHP and summer time DH supply mainly from gas heating plants. Therefore it was aimed to learn about the potential of integration of solar thermal and to reduce CO2-emissions by use of solar thermal.
In 2007, 3.5 MW (5000 m²) of solar thermal were built next to the heating plant on the roofs of the municipal recycling center. Later, areas at the heating plant became available and a collector field for all DH feed-in, testing and comparison was installed. Collectors of 7 different manufacturers and technologies were installed. Those collectors were tested and evaluated in R&D projects.