Eibiswald District Heating
The installed heat storage, with a capacity of 165 m³, results in an overall efficiency increase via energy management.
In 2008, the PepsiCo group ordered from SOLID a Solar Thermal system for the production of one million kWh thermal energy per year for the production of the Gatorade.
The first system was realized with a size of 893 m³ / 9,640 ft² collector area. Per m² gross collector area, more than 1,250 kWh/year were metered on the official heat meters of the local authorities.
In 2010, an extension to 2568 m² / 27500 ft² was ordered, followed by the third enlargement step in 2012 to the actual size of 3793 m²/ 41000 ft². In 2012, the system was the largest Solar Process Heat installation on the American continent.
The installation preheats production water for the soft drink production before the reverse osmosis plant of the site. Besides the thermal energy gains, the electricity demand of the reverse osmosis plant was significantly reduced due to the increased temperature level of the water.
Click on the button and we will be happy to help you!
The installed heat storage, with a capacity of 165 m³, results in an overall efficiency increase via energy management.
Energetika Vransko, the local utility, wanted to increase their green energy supply to the district heating system. The signs were good – especially lucrative funding
The village of Liggeringen is in the hills in the vincinity of Radolfzell at Lake Constance in Southern Germany, close to the Swiss border. There